Showing posts with label NWRL. Show all posts
Showing posts with label NWRL. Show all posts

Wednesday, August 1, 2012

NWRL justification

The justification for the North West Rail Link, contains a couple of interesting points in objective 4 in section 22.3.1:
(a) 29 million trips within 5 years of its opening, which is about half the number of trips currently using the bus system in the relevant region, region 4.  Obviously, people will still continue to use buses into Parramatta and other locations but I expect more than half of bus users are going to or from the CBD-Macquarie Park area.
(b) almost 160 buses are to be removed from the CBD in the morning peak.  This is approximately the amount of buses which enter the CBD in the morning peak from the North West.

I have little doubt that point (b) would not actually happen within the next decade, particularly while the rail-rail interchange at Chatswood remains.

Basically, the justification does not suggest an increase in the public transport usage in the North West.

Monday, July 9, 2012

Is Western Fast Rail back on the agenda?

As I previously blogged, the current government has made a number of apparently ill thought through and half baked announcements, firstly Richmond to Campbelltown then single deck metro from the North West to Chatswood.  The questions seems to be why?  I suggest that they have been softening up the voters for something they may not like.  What that might be is a revitalisation of the Western Fast Rail privatised project.  Reports from when the Liberals were still in opposition quoted the current transport minister as saying that the project should be looked at more seriously.

This is complete supposition; but you heard it here first!

Saturday, June 23, 2012

Cityrail timetable proposals in recent news - Part 3

An official video shows that the second phase of this plan involves:
  1. A new harbour crossing, connecting to the Metro Pitt alignment.
  2. Metro connecting to the Bankstown line and part of the Illawarra line.
  3. Removal of Campbelltown via Sydenham. 
  4. No increased capacity for the Western, South or North lines beyond what is possible now.
  5. Some Western line trains to take the slower path around the city circle.
Almost every aspect of this plan is daft.
  1. Sending metro trains down the Illawarra line to Hurstville means that some Railcorp passengers will be taken away from the Eastern Suburbs Railway, to be replaced by no one.
  2. Overtaking manoeuvres will no longer be possible.  All trains will likely need to run with the same stopping pattern, presumably Redfern, Sydenham, Wolli Creek, Rockdale, Kogarah, Hurstville and then all stations to Waterfall or Cronulla.  A capacity reducing skip stop is also possible.  It will be exceedingly difficult to operate the South Coast trains with only one pair of tracks the whole distance.
  3. Removing the Bankstown line from the city circle removes what is the only swing player between the Town Hall and Museum legs.  This will not be helpful.
  4. Removing Campbelltown via Sydenham will result in slower journeys and be less competitive with road transport, particularly with the planned M5 widening.  I do not think that additional frequency through the Airport line adds nearly as much value.
  5. Additional Western line paths into the city circle requires them to either add a conflicting move at Macdonaldtown or traverse Strathfield platforms 7 and 8.  The latter will increase journey times, the former would reduce reliability.  There is a good reason why every inquiry has recommended a new CBD path, to prevent such trades from being made.  This new path is being done in such a way as most of the benefit which should be realised is completely wasted.  You might as well run in to the Wynyard platform 1 and 2 dead end as the trams used to.
If a crossing under the harbour is to be done, it really should increase capacity for the other side of Central.  This plan does not achieve that at all.  It wastes some of the presently available capacity.

I hope that we hear nothing further about this plan.

Friday, June 22, 2012

Cityrail timetable proposals in recent news - Part 2

It has recently been announced that the promised plans of double deck services from the North West all the way to the CBD are to be revised.  They are going back to a North West metro, single deck, and only running as far as Chatswood as a first phase.

Firstly, this means that the upper Northern Line will need to revert to running via Strathfield.  Unless it is going to take paths through Town Hall platform 3 from the Western Line it will also mean that the upper Northern Line will terminate at Sydney Terminal.  The only question raised with this is if there is enough capacity between Redfern, Central and Town Hall.  Well in the AM peak 4/6 Bankstown line trains add to this capacity.  This should be relatively simple to expand to the other two with a timetable review.  This capacity should be relatively easy to provide in the AM peak, and the PM peak is far less congested.  Reversing the direction of the Bankstown line around the city circle full time may well be a reasonable option, as might Melbourne weekend style Bankstown-Town Hall-Museum-Bankstown full time.

Secondly, it means no expansion to Railcorp and in fact a slight contraction as they will be removed from the Epping-Chatswood Rail Link.  In my opinion, this is real positive to the proposal.  I'm really not sure how long we can go having Railcorp consume $3 billion per year and rapidly rising.

Thirdly it means an interchange at Chatswood for trains which are allegedly already full.  However, they aren't as full as trains on other lines and the upper Northern Line passengers are to be removed from this patronage.  It will also be possible to increase the numbers of trains on the North Shore by up to 6 per hour.  There will be plenty of capacity for passengers from the North West who will have a cross platform interchange at Chatswood, much like Glen Waverley line peak hour passengers in Melbourne who need to interchange at Richmond to reach city loop stations.  Hardly the end of the world.

All in all the first phase of these changes is quite good, which is something I will not say about the second phase in my next blog post.

Sunday, June 3, 2012

Second rail harbour crossing back on the agenda

The Sydney Morning Herald has again reported that a new harbour crossing is back on the agenda.  The SMH reports that the advice to Gladys Berejiklian is this is needed for natural growth and the NWRL.  Well, sort of.  It is only needed in this or the next decade because of the NWRL.

It was always disingenuous and/or dishonest to suggest that the NWRL without a second harbour crossing was a reasonable policy, but it was a winning strategy at the 2011 NSW election.  In my opinion Infrastructure Australia was absolutely correct to rebuff the current NWRL plan.

Some people have suggested that signalling improvements could delay the need for this.  Well that may be, but it would not come cheap and nor would it remove some remaining conflicting moves particularly at Macdonaldtown.  Signalling improvements also would not help to remove the south line from the need to pass the platform faces between Summer Hill and Macdonaldtown - these lines are slower than the centre pair of tracks, which are slower than the northern pair of tracks.  There needs to be a study on the bang for buck of this particular option.  Personally, I believe it will defer the need for track amplifications only slightly so should not proceed.

What about single deck?  Well while you might have more trains, the number of seats on the line would be reduced for sure.  It is unclear whether or not the number of standing spaces would be increased by enough to compensate, but I think it is fair to say that reduced seating is against what Sydneysiders want.  There are similar issues with increasing the number of doors per carriage.

The SMH also reports that the "City Relief Line" is dead.  Well, that's creative politicking right there.  Transport for NSW report that all options feature a "CBD enhancement" which is basically the city relief line by another name.  As for the suggestion the under the harbour line might connect to the Illawarra, that is insane, and a waste of web bandwidth to debunk.

Monday, May 21, 2012

Harbour Bridge bus congestion - will the NWRL fix it?

Recently, 358 buses were timetabled to arrive at Wynyard from the Harbour Bridge in the hour from 8am to 8:59am on a work day.  79 (or 22%) of these buses are M2 services.  So one might expect a significant reduction in congestion once you consider queueing theory's prediction that a small change in supply or demand can have a dramatic effect on waiting times.  This prediction has a number of problems:
  1. The remaining services can be expected to continue to grow.  Growth of 2.5% p.a. over 10 years would put us basically back where we started
  2. Cityrail's network could not handle this many additional passengers travelling over the Harbour Bridge without a lot of pain.  Transport for NSW's preferred plan is to run the trains for the upper Northern Line into Sydney Terminal, however two trains per hour via Gordon must also be trimmed.  These changes seem extremely unlikely to survive political interference, and the alternate plan of terminating every second NWRL train north of Sydney Harbour seems likely to proceed
  3. If only half of the promised 8 per hour trains actually reach Wynyard, it is likely that the short workings will not add much value.  Their value would be increased by the previously proposed quad between St Leonards and Chatswood.  This would allow people bound for stations up to St Leonards to use the short workings, and running the full distance trains express between Epping and St Leonards would also channel people who can use the short workings on to them.
  4. Integrated fares have not been achieved in Sydney, and even if they were it is unclear that people from the Hills District would be willing to use a feeder bus to reach the station.  If they will not, then that means very expensive parking must be provided, a reduction in the market penetration of public transport or the buses along the M2 to the city and North Sydney would need to be retained in a reasonably large number.
  5. An additional 25 or so buses reach North Sydney from the M2 between 8am and 8:59am on a working day.  It is estimated that between the Wynyard direct and North Sydney/Milsons Point buses that 4 trains per hour reaching North Sydney and Wynyard would be insufficient to meet demand.
So it can be seen that the North West Rail Link can not be relied on to fix bus congestion on the Harbour Bridge.  A subsequent post will go in to solutions to fix these problems.